YEW TREE FARM, WYBUNBURY LANE, WYBUNBURY , Nr NANTWICH - COMPLIES
Lads on-site Monday 16th December 2024 to complete an upgrade of the septic tank which was discharging to land drains within the adjacent farmers field,
In addition one sink discharge was entering the surface water soak away, this was diverted into the new sewage treatment plant, excess spoil transferred off site by grab wagon, reclaimed washed sand and drainage bedding gravel delivered by grab and positioned at required points on site.
Installation completed by Friday 2oth December 2024, alas CHESHIRE EAST building control unavailable to attend site until 6th January 2025 ⁉️
site left clean and tidy for Xmas holiday. - drainage requirements call 📞. 07771 903612